The five steps of Lean Six Sigma (DMAIC) in one real project by Eege: the order-to-shipping process for flower orders, at a new location.

  1. DefineThe order-to-shipping process had to move to a new location. How do you set it up?
  2. MeasureValue stream analysis and data. The box machine turned out to be down 26% of the time.
  3. AnalyseThree designs calculated on takt time, capacity and cost per product.
  4. ImproveOne-piece flow with QR scanning, first as a pilot on the floor.
  5. ControlIn place: 248 orders per hour with 13 FTE, against 17 FTE in the alternative.

4 FTE fewer for the same 248 orders per hour.

How a project runs

About one month
to the first results.
A subject matter expert
on your side, who knows the work from the inside.
An owner with a mandate
who decides on changes in the company and defends them.